So over the course of the past few seasons, there have been grumblings about the function of the outhaul. I thought little of it until I tried to move it under a relatively light wind load last season. That was enough to realize something needed to be done with it this winter.
With the boom in my basement, the work has been easy to complete. I started with removing the reefing lines out of the boom. Very easy to take out. Then came the removal of the cast aluminum pieces at the ends of the boom. The aft casting came out easily after remove of a couple of screws.
The forward casting proved to be a bit more difficult. Two of the four fasteners were completely stripped out and did not want to back out of their holes. So, with a bit of persuasion from a grinder, the fastener heads were ground off and the screws punched into the boom so that the casting could slide out of the boom. Prior to reassembly, the mounting holes were drilled out and tapped to a slightly larger size fastener.
With the castings off, the guts of the outhaul could be removed. As it turns out, the blocks inside the mast were completely seized up. Back when the outhaul operated properly, it gave a purchase of 3:1. The setup consisted of a set of blocks, one connected to a fixed point in the boom and the other connected to a cable running to the aft end of the boom, around a pulley, and out to the sail.
The new setup includes an added block and line to double the purchase to 6:1. Between the newer Harken blocks and the 6:1 setup, the outhaul is moving much more smoothly. The entire outhaul assembly had to be put together outside of the boom and then fished inside. All in all, I think I am very happy with this upgrade. I've considered adding a short piece of track and a Harken ball bearing car to the aft end of the boom so that the operation of the outhaul would be effortless under heavy load, but that modification may wait until a later date.
Monday, February 21, 2011
BULKHEAD FINISH PANEL
The bulkhead finish panel is complete. I used what was left of the old finish panel as a rough template for the new panel. Then the panel was fitted in place, marked, and final trimmed to the proper size. All the mounting hardware was also fitted. New cleats for the engine cover to rest on were made out of leftover white ash from another project.
I had a bit of a challenge trying to find a piece of mahogany plywood to make the new panel out of. The cost of a full sheet of plywood, plus a special order charge, was a bit ridiculous. In lieu of the more expensive mahogany, I opted for a free piece of marine grade birch plywood and stained the panel to match the mahogany. Obviously the grain differs, but the color match is relatively close.
Here are a few photos of the old and new panel.
The window was bedded in place with Life-Calk after the panel was installed. A padeye tie-off point for harnesses was also re-installed with a new backing plate made of 1/4" thick fiberglass panel.
I had a bit of a challenge trying to find a piece of mahogany plywood to make the new panel out of. The cost of a full sheet of plywood, plus a special order charge, was a bit ridiculous. In lieu of the more expensive mahogany, I opted for a free piece of marine grade birch plywood and stained the panel to match the mahogany. Obviously the grain differs, but the color match is relatively close.
Here are a few photos of the old and new panel.
The window was bedded in place with Life-Calk after the panel was installed. A padeye tie-off point for harnesses was also re-installed with a new backing plate made of 1/4" thick fiberglass panel.
Sunday, February 13, 2011
BULKHEAD REPAIR
The bulkhead over the engine has been repaired. The old bulkhead was removed and found to have absolutely no integrity left in it. All of its mounting locations were completely rotten and the bulkhead came out in two pieces.
A new bulkhead was constructed of marine grade plywood. The plywood was wrapped in fiberglass and several layers of Interlux 2000E applied.
I decided to modify the mounting conditions of the bulkhead. The old mounting consisted of four screws across the top of the bulkhead into the floor of the cockpit and another couple of screws into wood blocks at the base of the bulkhead.
The revised mounting condition across the top of the bulkhead remained the same except a piece of fiberglass angle was installed to provide a bit of additional support between the bulkhead and cockpit floor. At the sides of the bulkhead, a piece of fiberglass angle was attached between the bulkhead and adjacent fiberglass to take place of the blocks that had previously been installed at the base of the bulkhead.
I considered glassing this entire bulkhead in but decided it was better to use mechanical fasteners so that the bulkhead could be more easily removed in the future if needed.
A new bulkhead was constructed of marine grade plywood. The plywood was wrapped in fiberglass and several layers of Interlux 2000E applied.
I decided to modify the mounting conditions of the bulkhead. The old mounting consisted of four screws across the top of the bulkhead into the floor of the cockpit and another couple of screws into wood blocks at the base of the bulkhead.
The revised mounting condition across the top of the bulkhead remained the same except a piece of fiberglass angle was installed to provide a bit of additional support between the bulkhead and cockpit floor. At the sides of the bulkhead, a piece of fiberglass angle was attached between the bulkhead and adjacent fiberglass to take place of the blocks that had previously been installed at the base of the bulkhead.
I considered glassing this entire bulkhead in but decided it was better to use mechanical fasteners so that the bulkhead could be more easily removed in the future if needed.
COCKPIT SEAT REPAIR
There's been a bit of a soft spot in the port cockpit seat for the past couple of years that I decided it was time to tackle. So out came the cutting tools. I cut the top layer of deck into pieces about 2" x 2" with a dremel tool. In retrospect, a larger cutting tool would had made this part of the process go much more quickly, but the dremel tool worked just fine.
With a bit of cutting and prying, the top layer of fiberglass was removed. It turns out there was quite a bit of wet balsa core. Here's a picture of the initial area that was cut out and another of the remnants of the cut out.
As I got further into removing material, there was more wet core than I had anticipated. The wet core wrapped around the front of the traveler. So more fiberglass and core was removed. In order for the new fiberglass to have something to adhere to, the existing fiberglass needed to be feathered back around the repair area. In some areas, there really wasn't enough area around the repair to allow for a perfect feathering, so the best that could be done had to be good enough. Here is a picture of the area ready for the new layup.
Since fiberglass work was going to happen and I'm also going to rework the traveler, I decided to fiberglass in all of the old traveler hardware mounting locations. Areas where hardware was mounted were ground out so that they could be filled and a couple layers of fiberglass laid in to prevent the filled holes from cracking out in the future.
So all of the areas of glass work were ready to go. New balsa core and several layers of fiberglass where cut to the proper size. The major repair consisted of three layers of a 29 oz. biaxial fabric while the small repairs consisted of two layers of fabric.
At the large repair a layer of glass was laid over the bottom layer of existing fiberglass. Then the perimeter areas were filled with MarGlass filler. The new balsa core was set and mudded in at the perimeter by more MarGlass. Then three layers of glass were installed over the top of the core.
With a bit of cutting and prying, the top layer of fiberglass was removed. It turns out there was quite a bit of wet balsa core. Here's a picture of the initial area that was cut out and another of the remnants of the cut out.
As I got further into removing material, there was more wet core than I had anticipated. The wet core wrapped around the front of the traveler. So more fiberglass and core was removed. In order for the new fiberglass to have something to adhere to, the existing fiberglass needed to be feathered back around the repair area. In some areas, there really wasn't enough area around the repair to allow for a perfect feathering, so the best that could be done had to be good enough. Here is a picture of the area ready for the new layup.
Since fiberglass work was going to happen and I'm also going to rework the traveler, I decided to fiberglass in all of the old traveler hardware mounting locations. Areas where hardware was mounted were ground out so that they could be filled and a couple layers of fiberglass laid in to prevent the filled holes from cracking out in the future.
So all of the areas of glass work were ready to go. New balsa core and several layers of fiberglass where cut to the proper size. The major repair consisted of three layers of a 29 oz. biaxial fabric while the small repairs consisted of two layers of fabric.
At the large repair a layer of glass was laid over the bottom layer of existing fiberglass. Then the perimeter areas were filled with MarGlass filler. The new balsa core was set and mudded in at the perimeter by more MarGlass. Then three layers of glass were installed over the top of the core.
Sunday, October 17, 2010
SPRING LAUNCH & FALL HAUL OUT
Well, we made it into the water on May 22nd and I'm a bit behind on posting information. The new bottom performed well over the summer months. Very pleased with the results.


And now the season is over and Hullabaloo has been pulled back out of the water.
Many plans for this winter. I'm working on putting together the list of things to do. So far on the list is:
- Re-template the keel.
- Touch up a few imperfections on the bottom that I did not have time to address before launch in spring.
- Repair a soft spot in one of the cockpit seats.
- Re-install the bulkhead that goes over the engine compartment.
- Install a windward sheeting traveler and replace the main sheet cleat & pulleys (the existing cleat and pulleys have seen MUCH better days).
- Figure out why the transmission is slipping. This began about mid way through the season this year.
- Replace the batteries. I've been running on one very week battery for the season.
That's the list so far. And that is plenty to handle. Until the work begins, Hullabaloo is tucked away in heated storage next to another J/30 - Flock 'n Geese.
Sunday, May 16, 2010
BOTTOM COMPLETE!
The bottom is complete! The last three coats of barrier coat were applied about 1-week ago. Last Friday and Saturday, the barrier coat was sanded out as it had a bit of an orange peel texture. Since the orange peel was somewhat pronounced, we used an 80 grit on random orbit sanders to knock the orange peel down then finished off with more fine sand paper, eventually finishing off with a 220 grit.
The two photos below are after sanding the barrier coat and the final product.


The final finish is VC17. I had contemplated other bottom paints but settled in on VC17 due to my familiarity with the product and the ease of application. The VC was rolled on in two coats over the course of a couple of hours.
The final finish is relatively good. There are a few areas to address that didn't sand out as nicely as I had hoped they would, but I am happy with the final product. We'll leave the fine tuning for next winter.
Hullabaloo is scheduled to launch May 22nd. Over the course of the next week, we will hopefully be buffing and waxing the hull, installing the windows, and (more important than the other items) installing the prop shaft.
A new prop shaft is being cut as the old one had been somewhat worn where the shaft passed through the stuffing box and cutlass bearing on the strut. The new shaft should be here tomorrow.
The two photos below are after sanding the barrier coat and the final product.
The final finish is VC17. I had contemplated other bottom paints but settled in on VC17 due to my familiarity with the product and the ease of application. The VC was rolled on in two coats over the course of a couple of hours.
The final finish is relatively good. There are a few areas to address that didn't sand out as nicely as I had hoped they would, but I am happy with the final product. We'll leave the fine tuning for next winter.
Hullabaloo is scheduled to launch May 22nd. Over the course of the next week, we will hopefully be buffing and waxing the hull, installing the windows, and (more important than the other items) installing the prop shaft.
A new prop shaft is being cut as the old one had been somewhat worn where the shaft passed through the stuffing box and cutlass bearing on the strut. The new shaft should be here tomorrow.
Sunday, May 2, 2010
FAIRING COMPLETE - ON TO THE BARRIER COAT!
Well, fairing the hull is complete. Glyn and Joe helped out for a week night and we got most of the fairing complete, with the exception of a few pad locations.

The pad locations were faired out over the course of the next few days. Along with fairing these few locations out, we long boarded the bottom of the hull. The process of long boarding involves sanding the entire bottom of the hull with long boards (approximately 4" wide x 30" long boards with sandpaper attached to them). This allows for the hull to be sanded out without gouging the hull, as would likely occur with a small sanding pad. For this operation, we used 36 grit sandpaper.
The process of long boarding took the better part of the weekend. With this complete, I spent the next few week nights touching up areas of fairing that I felt needed work.
This past weekend we began spraying barrier coat. Prior to the barrier coat being applied, the hull was sanded lighting with 80 grit sand paper and then wiped down with Interlux 202 solvent. The water line was also re-taped to make sure the edge between the barrier coat and boot stripe was sharp. Then it was on to barrier coat.
I had decided to spray the barrier coat on in lieu of rolling. The barrier coat I had decided to use was Interlux 2000E. The spray gun used was an HVLP gun with a siphon cup. The gun had a 1.8 mm spray tip and ran at a pressure of approximately 50psi.
The first coat went on very slowly. The spray was very thin. I had assumed this was due to the thickness of the barrier coat product. After we had completed the spraying, I took apart the gun to clean it and discovered a very small paint filter that seriously restricted the flow of the 2000E. The filter was removed for subsequent coats of 2000E and allowed for a much faster application. There was a bit more splatter with the filter removed, but I do not anticipate this being an issue given how well 2000E sands out.
At this point, there are three coats of barrier coat sprayed. The bottom is looking good. There are some areas that will need attention. There are a number of pin head sized voids that need to be filled where blisters had previously existed and where the fairing process did not fill the voids. I will be experimenting this week with filling those voids, either with a brush applied 2000E or filling and sanding of the voids with Interfill fairing compound. In either case, I am hoping the bottom will be ready for bottom paint by the end of next weekend.
Here are a few photos of the bottom, after the 3rd coat of barrier coat.


The pad locations were faired out over the course of the next few days. Along with fairing these few locations out, we long boarded the bottom of the hull. The process of long boarding involves sanding the entire bottom of the hull with long boards (approximately 4" wide x 30" long boards with sandpaper attached to them). This allows for the hull to be sanded out without gouging the hull, as would likely occur with a small sanding pad. For this operation, we used 36 grit sandpaper.
The process of long boarding took the better part of the weekend. With this complete, I spent the next few week nights touching up areas of fairing that I felt needed work.
This past weekend we began spraying barrier coat. Prior to the barrier coat being applied, the hull was sanded lighting with 80 grit sand paper and then wiped down with Interlux 202 solvent. The water line was also re-taped to make sure the edge between the barrier coat and boot stripe was sharp. Then it was on to barrier coat.
I had decided to spray the barrier coat on in lieu of rolling. The barrier coat I had decided to use was Interlux 2000E. The spray gun used was an HVLP gun with a siphon cup. The gun had a 1.8 mm spray tip and ran at a pressure of approximately 50psi.
The first coat went on very slowly. The spray was very thin. I had assumed this was due to the thickness of the barrier coat product. After we had completed the spraying, I took apart the gun to clean it and discovered a very small paint filter that seriously restricted the flow of the 2000E. The filter was removed for subsequent coats of 2000E and allowed for a much faster application. There was a bit more splatter with the filter removed, but I do not anticipate this being an issue given how well 2000E sands out.
At this point, there are three coats of barrier coat sprayed. The bottom is looking good. There are some areas that will need attention. There are a number of pin head sized voids that need to be filled where blisters had previously existed and where the fairing process did not fill the voids. I will be experimenting this week with filling those voids, either with a brush applied 2000E or filling and sanding of the voids with Interfill fairing compound. In either case, I am hoping the bottom will be ready for bottom paint by the end of next weekend.
Here are a few photos of the bottom, after the 3rd coat of barrier coat.
Subscribe to:
Posts (Atom)